Meetings this week
Posted on January 12th, 2010 No commentsTues 3:15pm – Mech Report Team – EB atrium
(Andy P, Alex H, Danny M, Mike G, Steve M)
Wed 6pm – Body Team – HR Plant
(Kevin H, Ryan P, Jordan A)
Thurs 6:30pm – Communications Team – EB atrium
(Keith D, Sai C, Dan F)
Thurs 7pm – Panel Mounting Team – HR Plant
(Kevin H, Ryan P, Mike G)
Friday 11:40am – Fundraising Team (OR, can meet AFTER electrical team if you want. NO idea what time that will be over) – EB atrium
(Val S, Eden H, Amanda P, Raquel S)
Friday 12:00 noon – Electrical Team – EB atrium
(Dustin S, James Z, John D, Jake N, Andy L) -
Meeting notes 12/3/09
Posted on December 7th, 2009 No commentsTIMELINE: For anyone who missed the meeting, I’ve developed a timeline and put it in the heating plant. Some of the dates are flexible, SOME ARE NOT. The following things are slated for this week (if not already done):
Develop Solar Panel Test: Ryan P.
Re-mount Panels: Ryan P., Mike G.
Design/Build Battery Box: Dustin S., Raquel S.
Research/Register for parades: Val, Eden, Amanda
First Aid Training?: Keith (Keith, please research dates/classes for recertification. Talk to Steve Muren about this.)Mechanical Report Stuff:
Dwgs of Roll cage, dim’s, etc.: Mike G.
UniGraphics drawings: Andy P.
Impact Analysis: Andy P.
Summary of Vehicle Layout: Andy P., Alex H.?
“Finite Analysis Plans”: Andy P., Alex H.?
Design LIGHTS (stop,turn): Jake N.
Measure solar panel size, check regs: ANYONE WITH TIME
Find 4 missing solar panels: ANYONE WITH TIMECHEAP LUNCH: we are doing the cheap lunch program this Wednesday, Dec9.
10:30am-12pm Keith
11am-12pm Andy, Ryan
12pm-1pm Val, ZackNEXT MEETING: Since finals are next week, let’s skip meeting this week. The next meeting will be Friday 12/17/09 7PM in the atrium. IF the car is still there, we’ll move it to the heating plant to continue working on it.
-
Friday the 13th, and we’re still kickin’
Posted on November 13th, 2009 No commentsWell, it’s Friday November the 13th 2009. We’re almost done with all of our October projects:
-Communications
-Tire Changing (DONE)
-Carbon Fiber Floor
-Hinged Solar Panel Frames
-Roll CageThe NEXT STAGE will be to build a body!!!
-Dan is going to head up this project! Thanks Dan! We (Dan and I) will be meeting Friday morning (November 20) to discuss the planning. Anyone interested in helping plan, feel free to join us!
-The next meeting, 2PM on Friday November 20, we will be discussing options for the body! We will do some design work over the weekend, and then begin building on Monday of Thanksgiving break! Anyone interested in planning, research, or building? Come to the Friday meeting, or EMAIL me! (zoester@siue.edu)Also, I’d like to thank Jami (from SportService) for training us on campus today!!! Nearly EVERYONE is trained now! Our first game is this SUNDAY, NOVEMBER 15! We’ll be meeting in the parking lot next to the EB at 7:30AM. I’ll see you there!
-
RAMS TRAINING WEEK
Posted on November 9th, 2009 No commentsAs everyone knows, this is a busy week with RAMS training! Two meeting times:
Tues November 10, 6pm@Ed.JonesDome
Fri November 13, 2pm@EB1012This Sunday November 15 is our first fundraiser!!! I’ve sent out emails… if you didn’t receive one, and would like to participate, let me know!!
-Zack- -
Updated NASC Webpage
Posted on November 4th, 2009 No commentsFor those who want the latest and greatest NASC info, tune in to the webpage:
http://americansolarchallenge.org/events/asc2010/
Please pay special attention to the updated regulations, new as of October 18!!!
-
Meeting Notes 10/16
Posted on October 16th, 2009 No commentsRAMS Fundraising update–
We need TWO MORE PEOPLE!! Tell a friend, tell a buddy! Once again, the dates are:
Sunday November 15
Sunday November 22
Sunday November 29
Sunday December 20
Saturday, April 14Friday Oct 23 speed test?
People/projects/ETA’s:
a) Changing tires — Alex G, Jordan, Casey. ETA Oct 24
b) Solar Panel Frame Design CAD –Mike, Ryan P. ETA- Oct 23?
c) Communications –Keith, Megan. Order your parts already!!!
d) Roll Bar — Alex, Danny, Jason M., Kyle – waiting on Kyle…..
e) Carbon Fiber — Raquel and Brock—ETA Oct 23?Corporate fund-raising (ongoing) — Eden, Amanda, Val
MECHANICAL REPORT–Andy, Kyle– …work in progress…Friday Oct 30 decorate the car? VAL is in charge of this! Thanks Val!!!
-
Meeting Notes 10/2/09
Posted on October 2nd, 2009 No comments1) Next week’s meeting will be 2PM in the EB atrium. I (Zack) will not be able to come, so Raquel will head up the meeting.
2) Fund-Raising. Please check your Inbox, and reply ASAP.
3) I”ll need some volunteers with the Edwardsville Halloween parade. The parade will be Saturday October 31 (in the evening). Clear your calendars!
4) SPEED TEST! When we complete a) Roll bar b) Floor pan c) Tires changed d) new Solar Panel Frame and e) communications, I would like to do a SPEED TEST. We’ll take a lead and chase vehicle, along with the solar car, out to South University Drive, and see how fast we can get the car to go! Let’s set a tentative date, October 23 for the test.
5) Thanks to the following people for volunteering to help on October 25 with the middle school kids: Keith, Jake, Dan. Thanks guys!
6) People/projects/ETA’s:
Alex, Jordan, Casey — changing tires. (acquiring tire-changing equiptment, hoping to have new tires on the wheels tires by next Friday.)
Wires (ordering) — Zack, Dustin
Frame Design –Mike– preliminary designs complete. Hardware being ordered, hoping for completion in ??2 weeks?
MECHANICAL REPORT–Andy, Kyle– Unfortunate setbacks due to old Solar Car’s missing files
starting from scratch on new CAD designs, but the final results should be neat!
Fund Raising — (see emails)
SIUE Presentation –Zack — Powerpoint finished, presentation to Dean Savim complete. Final presentation to Nobby Emmanuel next week, on Friday. Wish me luck!
Communications –Keith, Megan– parts need ordered. ETA, 3 weeks? (in time for SPEED TEST?!!)
Roll Bar — Alex, Jason M. — Work in progress. Design goal? Oct 9? Construction goal, Oct 16?
Carbon Fiber — Raquel and Brock — initial floor pan complete, not cured yet.
Corporate fund-raising (ongoing) — Eden, Amanda, Val -
Meeting Notes 9/25/09
Posted on September 28th, 2009 No comments1) 37 weeks until Race Day!
2) People/projects/ETA’s:
Alex, Jordan, Casey – changing tires
Wires (ordering) – Zack, Dustin
Frame Design – Mike
MECHANICAL REPORT – Andy, Kyle
Fund Raising – Brian, Keith
SIUE Presentation – Zack
Communications (mounting repeater on roof, etc.) –Keith and Megan – 1 week?
Roll Bar – Alex and Mike – 2 weeks?
Carbon fiber floor pan/battery box —Raquel and Brock
Corporate fund-raising (ongoing) – Eden, Amanda, and Valerie
Parking brake? – Jimmy3) I still need 3 T-shirt designs from EVERYONE except Dan!
4) If you need something to do, take a look at the TO-DO poster! (I think the poster is located in the EB atrium? the car is currently at the top floor of the heating plant, I’ll try to move it downstairs in the next day or two.)
-
Company List – Please add a “comment” to reserve a company or add a new one!
Posted on September 18th, 2009 2 commentsCompany Team Member
1 Quiktrip Zack Oestereich
2 Home Depot Zack Oestereich
3 Anheuser Busch
4 Coca Cola Jake N.
5 Lowe’s Jake N.
6 Ameren Alex H.
7 Ted Drewes
8 US Steel
9 Conoco Phillips (Wood River) Alex H.
10 Fast Eddie’s Jake N.
11 St. Louis Bread Co.
12 Citi (Citibank, citimorgage)
13 Edward Jones
14 Schnuck’s Michael G.
15 Dierbergs
16 Olin Brass
17 Nestle Keith D.
18 Kraft Foods (springfield, MO)
19 Six Flags Valerie S.
20 Disney
21 Build-a-Bear
22 Scottrade
23 General Motors
24 Chrysler
25 Bally Total Fitness
26 Curves
27 US Cellular
28 United Airlines
29 Walgreens Keith D.
30 Solo Cup Company
31 McDonalds ?? Keith D.
32 Energizer Dan F.
33 Driltek Dan F. -
Meeting Notes 9/18
Posted on September 18th, 2009 No comments1) I need EACH of you to please pick 3 companies and design T-shirts to send to them. MAKE THEM LOOK (somewhat) PROFESSIONAL! I’m attaching two templates. You can open/edit them with ‘Paint’ on any windows machine. I would like to mail these next weekend, so please do THREE and get them to me sometime next week! I’m including a list of companies, feel free to come up with some creative solutions. Keep in mind, we’re sending T-shirt designs to companies that would be capable of sponsoring at our $4,000 level. 3 files I’m attaching to this email:
-T-shirt template
-My Home Depot example
-List of companies.
Some of the companies have been “taken”… when you choose your 3 companies, PLEASE add a comment on the website to the T-shirts section so everyone will know your 3 companies. www.ee.siue.edu/~solar2) JESC BBQ
Wednesday Sept 23 there will be a BBQ outside the EB. Thanks to the following volunteers:
Keith and Dustin 11-12, Raquel and Jake 12-1, Mike for making flyers (give to Keith or Dustin).3) Short list of current projects with ETA’s. If there is no ETA next to your project, please email me one! (thank you!):
Keith and Megan – Communications (mounting repeater on roof, etc.) – 2 weeks?
Alex and Mike – Roll Bar – 3 weeks?
Raquel and Brock – Carbon fiber floor pan – 2 weeks
– and battery box—3 weeks
Eden, Amanda, and Valerie – powerpoint presentation (Monday), fund-raising (ongoing)
Andy – CAD drawings of new body—1 week?
Zack and Kyle – preliminary Mechanical report – 2 weeks?
Brian – Contact RAMS for fund-raising opportunities??????????? What about the Blues? Cardinals? River City Rascals? Etc….
Jimmy – Parking brake? Are you still doing that?4) Jake Nichelson, Danny Mccullough, Jordan Albers, Dan Fox, Jason Mitchell, Ryan Paulsmeyer, Louis Browning, Ryan Carlton, Daniel Ahrens, Andrew Parcels, and Austin Cox—Several of you are new to the team, and perhaps wondering where you fit in. We have the “To-Do 2009” poster that NEEDS to be completed in the next 2-3 weeks! (a few items can’t be done that quickly/cheaply, but MOST of the list is short items!) I really need help with this! Now is your chance to shine! Pick something from the list, and compare the car to the regulations! Email each other, and get together in groups if you’d like! (dmccull@siue.edu, schapar@siue.edu, Jalbers6964@charter.net, danfox@siue.edu, jasmitc@siue.edu, rpaulsm@siue.edu, uni_boy15@hotmail.com, rcarlto@siue.edu, Ahrens.d@gmail.com, Andrew.parcels@me.com, acox@siue.edu ) Thanks in advance for any and all help you can give!