RSS icon Email icon Home icon
  • Meeting Notes 4/23/2010

    Posted on April 23rd, 2010 Dustin Sanders No comments

    Hey team. For those of you who couldn’t make it to the meeting (most of you *evil stare*)

    Here’s what was talked about.

    Solar Car team

    Friday April 23rd 2010

    Summer and new car discussions

    Summer
    – there’s work to be done
    •Who’s here for summer?

    Talk about groups

    Sign names on sheet and preference of group
    •Siue-solar.clockingit.com – show demo
    •Plans for summer

    FINISH THE OLD CAR!!! (Cougar Cruiser II)

    Complete the canopy

    Waterproof

    Install new battery pack

    Test test test!

    Impact analysis

    Anything else

    Cougar cruiser III?
    – Rough timeline

    Mechanical

    Summer 2010:

    Zack will work with art students on body design over summer. Plan to have a scale model by end of summer

    Fall/Spring 2010/2011:

    Design frame and suspension around body design, report with impact analysis done.

    Build body – work with frame design closely

    ….. (more specifics to come)

    Spring/Summer 2011:

    Build frame / test

    ….. (more specifics to come)

    Cougar cruiser iii or iv?
    – Rough Timeline

    Electrical

    Summer 2010

    Tweak/Install Battery pack

    Install Dash

    Fall/Spring 2010/2011

    Build CSIRO motor and test

    Build battery pack maybe…

    Design wiring schematic and electronics for driver

    …. (more specifics to come)

    Spring/Summer 2011

    Add solar cells to body

    Add electronics to car

    …. (more specifics to come)

    Cougar cruiser III?
    – Rough Timeline

    Logisitics

    Summer 2010

    Help other groups

    Fall/Spring 2010/2011

    Help other groups

    Spring/Summer 2011

    Ramp up for 2011 races

    Cougar cruiser III?
    – Rough Timeline

    Financial

    Summer 2010

    GRANT REQUESTS!!!

    Propaganda for summer

    Nice professional poster (have Steve print it on the plotter) – get laminated on cardboard (or something)

    Get new letters done and sent for approval

    Telethon? – Alumni

    Fall/Spring 2010/2011

    Send approved letters

    Setup other fundraising events on campus (while its nice out)

    Spring/Summer 2011

    ???

    Lets brain storm!

    Cougar cruiser III

    Brainstorm on the 3 wheel design. It was pretty unanimous to go with front 2 wheels stearing and rear fixed drive wheel. Dr. Lozowski poped in an hr late to the meeting, but offered some advise, we need to try to balance the weight around the center (which we planned on). I wanna make the who thing as low to the ground as possible without causing exess drag.

    Also we should simulate the body using comsol, a software we can get for free after going to their little training seminar (which kevin will work on the logistics of sending a few people up there to take the class and its free)

    That’s about it, i’ll be sending clockingit logins to the people who are going to be here over the summer. If you missed the meeting because you forgot (almost you jake) then let me know and I’ll throw you on the list.

    Thanks all! Looking foward to working with you this summer!


    Dustin Sanders
    Computer/Electrical Engineering
    Southern Illinois University Edwardsville
    Director of SIUe’s Solar Car Team
    www.ee.siue.edu/~solar